Updates to BSI PAS110
The Organics Recycling Group recently ran a workshop which focused on the requirements of the new BSI PAS 110, the new AD Quality Protocol and the Biofertiliser Certification Scheme (BCS) Rules.
Albion Environmental Ltd attended this workshop and can advise that a copy of the new standards are due to be released very soon and the transitional steps will be:
- 4 months grace period from date of release.
- AD operators can choose to be inspected against the old PAS for 4 months after the release.
- After the end of this period operators can only be inspected against new PAS 110.
A link to the BSI PAS110 updates will be added to our website as soon as they become available.